Processing
Plant Automation
- The system now properly reports the correct machine for bars processed in ABLl (Auto-Bar Logic) mode. (4341, 2026-02-09)
- Addressed an issue in which aSa would sometimes send incorrect bar diameter information to the Schilt system in a metric bar size environment. (9086, 2025-10-31)
On Demand Processing
- Corrected an issue in which on-demand tags did not print in certain scenarios. (12742, 2026-02-26)
- Improved the way the system handles concurrent users/machines attempting to process tags at the same time. (3983, 2026-02-09)
Processing
- If you set an unrestricted special bundling option in Processing, this now overrides the Units per Processing Tag value from the Product screen. (12360, 2026-02-16)
- When you split an item, the resulting "new" line items are now accurate. (11620, 2026-01-21)
- Corrected an issue in which length measurements on tags did not always display in the unit specified in the session Printing Defaults. (10351, 2025-12-19)
- If you import an order from RDX that contains a custom shape with no defined image, the shape ID now imports and populates correctly. Previously, the shape ID was missing in the Processing grid. (9524, 20258-12-18)
- Improved validations and performance related to splitting items in the Material tab. (9484, 2025-11-24)
- Addressed time-out issue that occurred in certain environments. (8965, 2025-10-27)
Reports
- Eliminated issue in which extra blank pages printed with the Shear Schedule. (8748, 2025-10-17)
Reprocessing Utility
- You can now reprint the Kit Assembly Checklist without issues. (9150, 2025-11-05)
Routing
- When the system cannot assign a complete route based on defined constraints, the route displays as the following: (6605, 2026-02-09)
- Machine 1 > ??? (partial route)
- Invalid Route (first machine cannot be assigned)
- You can now route one-plane bending to multiple bending machines; previously, two-step bending was only available for two-plane bar shapes. (12224, 2026-02-12)
- Added validations to address the scenario in which material is assigned to a machine, then the machine is deleted or marked inactive before the material is produced. (10547, 2026-01-12)
- Addressed issue in which the program sometimes selected partial routes rather than better, complete routes. (9343, 2025-11-19)
- Corrected situation in which the system would not always allow you to assign a new machine even the machine was valid. (9181, 2025-11-06)