You can specify the sequence in which a day or shift's loads are printed on the Load report. Typically, you would sequence the loads so that the highest priority loads are first. 

To prioritize loads:

  • On the Scheduling screen > Load Building panel, drag and drop loads into the desired sequence. 

or

  • On the Load Calendar screen, drag and drop loads into the desired sequence. Refer to Load Inquiry.

Changing the sequence of loads on the Scheduling screen automatically updates the Load Calendar screen and vice versa.