Level

WBS is simply a way to break down a project into its components, such as segments, bid items, or any other grouping that works for your business. For an overview, refer to Work Breakdown Structure.

Click to select the Work Breakdown Structure (WBS) level for the current item. Job-level options determine:

  • whether selecting a WBS level is required
  • if it is required, the minimum level within the structure that must be selected